Sunday, July 15, 2012

1st Work Weekend

We started are the morning off with elections.  John was elected President.  Deena was elected secretary.  Debbie was elected safety officer.  Brandon was elected Treasure.  After we finished our meeting, we started to string our property lines.
Fences was added behind Debbie's house.

Stringing the property.

Pulling the string tight.

Cutting rebar for the corners of the property and the houses.

Checking the property line.

Adding the stake at the front of the property.

Marking out the 1st house.
 
Marking out the second home.

House 1 chalked out and ready for the footings to  be dug.

Measuring.

Deena's property chalked out.
We began our 2nd day with a safety meeting.  Then we started marking out two more houses.  We were really excited to mark out our house.  The excitement was gone after working on it for 4 hours.  So excited when finally got it right.  Only to have to move it 5 inches.

Finishing up digging the footings near a tree.

Brandon and Patricia's house.
 
Deena measuring my house for the 100th time.

Debbie and Deena working together to correct the 2" that we were off.

John measuring our house.  We lost track of how many times we measured our  house.

Chalking our house.  Deena is on our front porch.

Our house finished from the front door side.


Our house from the drive way.

Deena holding her chalk bucket.
Deena modeling her tool belt with pink hammer.

More measuring.

Jacob hammering in a stake.


And more measuring.
By the end of the weekend, we had chalked out 9 houses, 2 house almost finished, and one shed moved.  We worked hard.